Manager, Consultancy | Engineers India Limited | Delhi
- Led Utilities & Offsites (U&O) 15-member Civil Team, from Concept to Commissioning, to deliver the World’s Largest Single Train Refinery & Petrochemical Project (650,000 bpd) at Lagos, Nigeria. Successfully handled multiple international stakeholders while ensuring a 15% optimization in civil engineering efforts during project delivery. This project has been designated by Project Management Institute (PMI) as one of the top 20 World’s Most Influential projects.
- Collaborated with marketing team and secured a $200 million Project Management Consultancy (PMC) from Government of Guyana along with a Front-End Engineering and Design & PMC project from an Algerian Client.
- Led the Project Management Consultancy Civil team for delivering 300 MW Combined Cycle Power Plant and Natural Gas Liquids project at Georgetown, Guyana. Coordinated with Guyanese government, USA Exim bank professionals, to ensure compliance with the Environmental requirements linked to project finance milestones.
- Delivered detailed feasibility studies for Surface Coal-gasification to value-added products project for India's 2nd largest steel manufacturer and recommended solutions for process chain optimization to maximize plant utilization.
- Successfully conducted the Techno-Economic feasibility study for surface coal gasification to ammonium nitrate project for Southern India’s Largest Coal producer; specifically assisting Client for finalizing the Project site location while coordinating with government agencies and national & international Process Licensors.
- Developed the departmental proposal management system with specific focus on the green ammonia and green hydrogen projects.
- Accomplished a 30% reduction in departmental item rate tender preparation efforts by developing standardized quantification system delivering a consistent pre-filled schedule of rates document and a scalability potential at the enterprise level
Deputy Manager, Consultancy | Engineers India Limited | Delhi
- Delivered a $200,000 saving by optimizing engineering deliverable process for production of pipe isometrics.
- Designed an innovative solution to incorporate already executed construction work of the Fire station building and achieved a saving of $300,000 in costs and 20 days in construction schedule while ensuring compliance to statutory and code requirements for oil and gas refinery complex at Nigeria.
- Evaluated and successfully handled $70 million contract for implementation of Water Packages and $35 million contract for implementation of 5 Cooling Towers: providing civil engineering design, acting as the single point authority for contract implementation and coordination among the Client, the vendor, and organization’s diverse departments.
- Mentored 25 Nigerian nationals as part of Client's Exchange program for a period of 6 months by curating a training module, organizing information sessions, and conducting performance tests.
- Conceptualized and developed 10 numbers of specifications and standards for mobile fire-fighting devices to meet the European and American norms while steering departmental quality sub-committee.
- Led the Utilities & Offsites (U&O) 3-member Structural Design Team for execution of BSVI fuel project.
Engineer, Construction | Engineers India Limited | Kochi & Mangalore
- Successfully executed and handled contract worth $11.2 million for structural fabrication and erection involved in the execution of Crude distillation unit & Delayed Coker unit while coordinating with 3 different contractors in an extremely space constrained construction site.
- Implemented a new erection philosophy at construction site with customization option to provide flexibility to execution team and achieved a saving of 35 days in schedule.
- Provided construction management services for implementation of Strategic Storage of Crude Oil working for development of 30 m deep underground tunnels.